Commissioned on 15 November 2016, the facility covers a total land area of 2,000 m² and is strategically located within the Tiko Wharf, in the South-West Region.
It comprises the following infrastructure and facilities:
- A 1,000 m² warehouse dedicated to storage operations.
- Fifteen (15) offices, each measuring 9 m², intended to accommodate the various administrative services.
- Two (2) conference rooms, each covering an area of 15 m².
- A borehole equipped with a 5 m³ water storage tank.
- A dedicated space for accommodating two (2) refrigerated containers (reefers).
- A Hyster forklift for cargo handling and other logistics operations.